LHP Historical Repairs Listing (Updated March 15, 2026)

Please reach out to Board Secretary Chad Moller (chad.moller1@gmail.com) with questions, additions or corrections.

Year Project
2026 Replaced martini deck at pool
2026 Repaired entrance driveway
2025 Repaired lighthouse at main entrance and pool deck
2025 Replace roofs on buildings 1-5
2025 Replaced board walk at buildings 8, 9 & 10
2025 Sold excess property behind upper parking lot
2025 Painted brick molding on storage closets on buildings 1-6
2025 Caulked pool cracks
2025 Replaced floors on the three elevators
2025 Installed concrete sidewalk behind building 6
2025 Replaced bad deck boards  and stained on lighthouse pool deck
2025 Repaired/replaced stair tower 7/8
2025 Replaced gate key pad
2025 Dock revision to Dock C at Matt Wells request ( enlarged end slip by 2 ft.)
2024 Painted beam from parking lot to sidewalk at buildings 8-10
2024 Painted storage and mechanical doors
2023 Caulked cracks in sidewalks
2023 Replaced buidling signs identifing unit numbers
2023 Upgraded WiFi thoughtout the complex and at the club house.  Purchased TV, camera and computer for zoom meetings at the clubhouse.
2022 Replaced/repaired stair tower 9/10
2022 Installed fire extingisher on every floor
2022 Repaired stair tower 3
2021 Replaced/repaired stair tower 6/7
2021 Power cleaned all buildings on parking lot side including walkways, gutters, soffits, gable ends and railing.  Building 1-5 lake-side was also cleaned.
2021 Moratorium on Touchless boat covers
2021 Elevator door operator control systems replaced on all three elevators. $47,000
2021 Purchased 14 de-icers for boat docks
2020 Flooring underlayment requirements passed
2019 Replaced/repaired stair tower Building 10 (west side)
2019 Building 9 and 10 roofs replaced
2019 Buildings 9 and 10 decks leveled
2019 Pool deck replaced
2019 Building 9 and 10 parking lot side steel work done and band boards
2018 Bid for property management contract
2018 Painted and recoated pool
2018 Removed gas line at buildings 9 & 10
2018 Buildings 1, 2, & 3 metal and lakeside deck work done
2018 Parking lot resealed
2017 Board passed motion to borrow $1.1 million for repairs
2017 Removed and replaced all windows on stacks at buidlings 1, 2 &3
2014 Law suit filed